Questions 8-12
  1 Read this memorandum.
  2 Choose the best sentence from the list A – I" />

奶昔直播官方版-奶昔直播直播视频在线观看免费版下载-奶昔直播安卓版本免费安装

  首頁 課程  書店 學(xué)校  題庫 論壇  網(wǎng)校  地方分站: 北京 | 上海 | 鄭州 | 天津 | 山東
報(bào)名咨詢熱線:010-51268840、51268841
 BEC商務(wù)英語考試網(wǎng)
 新聞動(dòng)態(tài)  報(bào)考指南   經(jīng)驗(yàn)交流  考試答疑區(qū)  BEC學(xué)友圈  熱點(diǎn)課程  網(wǎng)絡(luò)課程  熱門下載
 BEC初級(jí):真題|模擬題|輔導(dǎo)(聽力/閱讀/口語/寫作) BEC中級(jí):真題|模擬題|輔導(dǎo)(聽力/閱讀/口語/寫作) BEC高級(jí):真題|模擬題|輔導(dǎo)(聽力/閱讀/口語/寫作)

2012年商務(wù)英語中級(jí)考試閱讀指點(diǎn)(10)

作者:   發(fā)布時(shí)間:2011-12-26  來源:育路教育網(wǎng)
  • 文章正文
  • 網(wǎng)校課程
  • 資料下載
  • 熱門話題
  • 論壇
無標(biāo)題文檔

   PART TWO
  Questions 8-12
  1 Read this memorandum.
  2 Choose the best sentence from the list A – I to fill each of the blanks.
  3 For each blank (8 - 12) mark one letter (A - I) on your Answer Sheet.
  4 De not mark any letter twice.
  5 One answer has teen given as an example.
  MEMORANDUM
  To: Filma Williams, school of Architecture
  From: Ram S. Johnson, Physical Plant Operations
  Subject: Air-conditioning Installation Costs for East Hall.
  Date: 4.4.94
  As you requested in your memo of March 15, we have studied the costs of installing air conditioning for the seven offices and two studio classrooms in East Hall ____ Example ____
  Office and Classroom installation
  Estimates were obtained from three contractors on the costs of covering the offices and classrooms ____ 8 ____ The work would take about three weeks.
  Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period ____ 9 ____ Sheet metal work to build out lest in the classes could be dine on weekends, and the overtime labour costs of about $ 1,500 have been included in the estimates.
  Arrangements were not made to do the office space installation on weekends … 10 …
  Additional Installation
  Because a larger installation, including a more powerful central unit, would be necessary to handle the halls and stairways, an additional $6,000 would be required for the equipment. ____ 11 ____ If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way ____ 12 ____
  Summary
  The total job for the building would be about $ 35,000 if done at one time. A two-stage installation would cost about $55,000. I can get official bids at your request.
  Example: A
  A. As you suggested, we also sought information on the additional cost of air conditioning in the entrance halls and stairways.
  B. All these three were in the $ 20,000 to $ 25,000 range.
  C. This later installation would cost about $20,000.
  D. However, class interruption should be minimal.
  E. In the same way, each of these three would take at least one month.
  F. Therefore, the total cost was this $6,000 plus another $5,000.
  G. Labour costs would be an additional S 5,000, bringing the total cost of the addition to $11,000.
  H. Each faculty member could expect to have workers in office for about one day.
  I. So faculty members can continue their office work as usual.
  答案:8.B 9. D 10. H 11. G 12. C

課程名稱 老師 課時(shí) 試聽 報(bào)名 學(xué)費(fèi)
BEC初級(jí)精講班 苗永金 20 試聽 200元
BEC中級(jí)精講班 謝老師 40 試聽 200元
BEC高級(jí)精講班 馬老師 20 試聽 200元
BEC高級(jí)習(xí)題班(考官主講) 譚松柏 16 試聽 200元
BEC寫作精講班(贈(zèng)送) 王 皙 20 試聽 200元(贈(zèng))
                                                                        查看更多課程>>
熱門資料下載:
商務(wù)英語考試論壇熱貼:
【責(zé)任編輯:育路編輯  糾錯(cuò)
[an error occurred while processing this directive]
外語培訓(xùn)咨詢電話:010-51294614
課程輔導(dǎo)
                    
[an error occurred while processing this directive]
 考試科目輔導(dǎo)
                       更多>>
[an error occurred while processing this directive]