奶昔直播官方版-奶昔直播直播视频在线观看免费版下载-奶昔直播安卓版本免费安装

報(bào)名咨詢熱線:010-51268840、51268841
 BEC商務(wù)英語(yǔ)考試網(wǎng)
 新聞動(dòng)態(tài)  報(bào)考指南   經(jīng)驗(yàn)交流  考試答疑區(qū)  BEC學(xué)友圈  熱點(diǎn)課程  網(wǎng)絡(luò)課程  熱門(mén)下載
 BEC初級(jí):真題|模擬題|輔導(dǎo)(聽(tīng)力/閱讀/口語(yǔ)/寫(xiě)作) BEC中級(jí):真題|模擬題|輔導(dǎo)(聽(tīng)力/閱讀/口語(yǔ)/寫(xiě)作) BEC高級(jí):真題|模擬題|輔導(dǎo)(聽(tīng)力/閱讀/口語(yǔ)/寫(xiě)作)

2011年商務(wù)英語(yǔ)BEC中級(jí)考前沖刺精選題(2)

作者:   發(fā)布時(shí)間:2011-07-21  來(lái)源:育路教育網(wǎng)
  • 文章正文
  • 網(wǎng)校課程
  • 資料下載
  • 熱門(mén)話題
  • 論壇
無(wú)標(biāo)題文檔

  PART TWO

  Questions 8-12

  Read this memorandum.

  Choose the lest sentence from the list A-I to fill each of the blanks.

  For each blank (8-12) mark one letter (A-I) on your Answer Sheet.

  De not mark any letter twice.

  One answer has teen given as an example.

  MEMORANDUM

  To: Filma Williams ,school of Architecture

  From : Ram S. Johnson ,Physical Plant Operations

  Subject : Air-conditioning Installation Costs for East Hall.

  Date : 4.4.94

  As you requested in your memo of March 15, we have studied the costs of installing air conditioning for the seven offices and two studio classrooms in Eest Hall ...example...

  Office and Classroom installation

  Estimates were obtained from three contractors on the costs of covering the offices and classrooms ...8...The work would take about three weeks.

  Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period...9... Sheet metal work to build out lest in the classes could be done on weekends , and the overtime labour costs of about $1,500 have been included in the estimates.

  Arrangements were not made to do the office space installation on weekends `.. ... 10... ..

  Additional Installation

  Because a larger installation, including a more powerful central unit, would be necessary to handle the halls and stairways ,an additional $6 , 000 would be required for the equipment. .....11 ... If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way ...12...

  Summary

  the total job for the building would be about $ 35, 000 if done at one time. A two-stage installation would cost about $55 ,000. I can get official bids at your request.

  Example: A

  A As you suggested, we also sought information on the additional cost of air

  conditioning in the entrance halls and stairways.

  B All these three were in the $ 20,000 to $25,000 range.

  C This later installation would cost about $20,000.

  D However, class interruption should be minimal.

  E In the same way, each of these three would take at least one month.

  F therefore ,the total cost was this $6 ,000 plus another $5,000.

  G Labour costs would be an additional S 5 ,000,bringing the total cost of the addition to $11 ,000.

  H Each faculty member could expect to have workers in the office for about one day.

  I So faculty members can continue their office work as usual.

  8. B 9. D 10. H 11. G 12. C

課程名稱 老師 課時(shí) 試聽(tīng) 報(bào)名 學(xué)費(fèi)
BEC初級(jí)精講班 苗永金 20 試聽(tīng) 200元
BEC中級(jí)精講班 謝老師 40 試聽(tīng) 200元
BEC高級(jí)精講班 馬老師 20 試聽(tīng) 200元
BEC高級(jí)習(xí)題班(考官主講) 譚松柏 16 試聽(tīng) 200元
BEC寫(xiě)作精講班(贈(zèng)送) 王 皙 20 試聽(tīng) 200元(贈(zèng))
                                                                        查看更多課程>>
熱門(mén)資料下載:
商務(wù)英語(yǔ)考試論壇熱貼:
【責(zé)任編輯:育路編輯  糾錯(cuò)
[an error occurred while processing this directive]
外語(yǔ)培訓(xùn)咨詢電話:010-51294614
課程輔導(dǎo)
                    
[an error occurred while processing this directive]
 考試科目輔導(dǎo)
                       更多>>
[an error occurred while processing this directive]